Demo

Interactive demo. Every leak rate and deadline here is computed by the real Ref LeakLog engine — on a fictional fleet. Nothing can be edited.

Start Free Trial
Equipment

Blast Chiller — Prep Room

Leak Rate Exceeded — 182.5% (threshold: 20%)

Commercial Refrigeration · 20% EPA threshold

Ref LeakLog caught this leak the moment it was logged — and started the 30-day EPA repair clock automatically.

No spreadsheet caught it. No one had to remember the deadline.

Start Your 14-Day Trial

Equipment Details

Refrigerant Type

R-404A

Full Charge

40 lbs

Full Charge Method

Manufacturer / owner determination

Installed

7/20/2024

Category

Commercial Refrigeration

EPA Threshold

20%

Serial Number

DEMO-SN-2260

Model Number

Master-Bilt BCF-60

Customer Site

Hillside Grocery — Store #4

Unit Location

Prep room

Added

1/31/2026

Quick Stats

Service Events4
Open Repairs2
Current Leak Rate182.5%
365-Day Total42 lbs

Chronic Leaker

105%of 125% threshold

42 lbs of 50.0 lbs limit (2026)

Open Repairs

Deadline: 7/10/2026OVERDUE
Deadline: 4/21/2026OVERDUE

Leak Inspections

No recurring schedule — § 84.106(g) inspections are required after a unit exceeds its leak-rate threshold and its repair passes the follow-up verification test.

Service History

+9 lbs

ANN

7/25/2026 · Marisol Vega· Losing charge again. Evaporator coil likely corroded through — quoting replacement.

182.5%

+11 lbs

ANN

6/10/2026 · Kevin Ott

250.9%

+10 lbs

ANN

5/1/2026 · Marisol Vega

228.1%

+12 lbs

ANN

3/22/2026 · Kevin Ott

30.0%