Repair Tracking
Manage EPA-mandated repairs and verification tests across your fleet
Active
3
Overdue
2
Awaiting Verify
0
Repaired (Month)
0
Blast Chiller — Prep Room
FailedPrep roomR-404A30.0% leak rate2 tests
Auto-created: Leak rate 30.0% exceeds 20% threshold.
119d overdue
6/4/2026
Blast Chiller — Prep Room
OpenPrep roomR-404A250.9% leak rate
Auto-created: Leak rate 250.9% exceeds 20% threshold.
39d overdue
8/23/2026
CU-7 — Rack A Condensing Unit
OpenRoof, rack AR-404A29.2% leak rate
Auto-created: Leak rate 29.2% exceeds 20% threshold.
16d left
10/17/2026