Industrial Process Refrigeration Under the 2026 Rule: the 30% Rate, the 120-Day Shutdown, and the Extensions Written for IPR

Process cooling gets the loosest leak rate in the 2026 rule — 30% — and the only longer repair clock: 120 days when the repair needs an industrial process shutdown. And the only grounds the rule lists for extending a retrofit or retirement are written for IPR. Here's everything that's different for IPR, what isn't, and the January 1, 2027 date for big systems.

10 min read
ByRef LeakLog Team
Subpart CEPAindustrial process refrigerationleak raterepair deadlineretrofit or retireautomatic leak detection

If you own or run process cooling — a chemical or pharmaceutical line, a manufacturing process loop, an industrial ice machine, an ice rink — the 2026 leak-repair rule treats your appliances differently from a supermarket rack or an office chiller in four specific places. It also treats them exactly the same in several places people assume it doesn't.

This post is the map. It's written for the owner or operator, because that's who the rule addresses — and for the contractor who services the plant, because you're the one who has to know which clock is running.

Everything below comes from 40 CFR § 84.106 and § 84.108, as published on eCFR (subpart C last amended in December 2024; eCFR current through November 19, 2026), and the rule's preamble at 89 FR 82682.

30%
IPR Leak Rate (vs 20% and 10%)
120 days
Repair Clock With a Process Shutdown
270 days
Outer Cap on a Parts Extension
Jan 1, 2027
ALD Date for 1,500-lb Systems Installed 2017–2025

First: Is It Actually Industrial Process Refrigeration?

The category is defined in § 84.102, and the details — with the definition verbatim — are in our post on the three appliance categories. The parts that matter most for a plant:

§ 84.102 — 'Industrial process refrigeration', in short

"Complex customized refrigerant-containing appliances that are directly linked to the processes used in, for example, the chemical, pharmaceutical, petrochemical, and manufacturing industries." The sector "also includes industrial ice machines, appliances used directly in the generation of electricity, and ice rinks." And the split-use rule: where one appliance serves both process and other loads, it's industrial process refrigeration "if 50 percent or more of its operating capacity is used for industrial process refrigeration."

Cold storage is the common trap at a food plant. Commercial refrigeration covers the cold storage warehouse subsector, and its definition says cold storage includes appliances "used to store meat, produce, dairy products, and other perishable goods" (§ 84.102). Storage refrigeration that fits that wording is commercial refrigeration at 20%, even when the process cooling beside it is IPR at 30%.

The 50% rule is the one to write down. A chiller that carries the process load and some building comfort cooling is IPR if the process takes half or more of its capacity — and comfort cooling, at 10%, if it doesn't. Record how you made that call; it sets every number below.

The category comes second, though. Whether the appliance is covered at all is § 84.106(a): a full charge of 15 pounds or more of a refrigerant that contains a listed HFC, or a substitute with a GWP above 53. Ammonia and CO2 systems aren't reached by that test, and many industrial systems run on them. A system running solely on an ozone-depleting refrigerant such as R-22 is outside § 84.106 ((a)(3)(i)); the older Section 608 rule, § 82.157, covers it at 50 pounds or more. The applicability checker runs the refrigerant test for you.

Difference 1: The Leak Rate Is 30%

§ 84.106(c)(2)

"(i) 20 percent leak rate for commercial refrigeration appliances; (ii) 30 percent leak rate for industrial process refrigeration appliances; and (iii) 10 percent leak rate for comfort cooling appliances, refrigerated transport appliances, or other refrigerant-containing appliances with a full charge of 15 or more pounds of refrigerant not covered by paragraph (c)(2)(i) or (ii) of this section."

What 30% doesn't change: the calculation itself. "The owner or operator must calculate the leak rate every time refrigerant is added to an appliance" (§ 84.106(b)), with the same three exceptions as everyone else — an addition right after a retrofit, after installing a new appliance, or one that qualifies as a seasonal variance.

Here's how the higher threshold plays out on the annualizing method. Take a 1,200-lb process chiller, 30 days after its last addition:

AdditionAnnualized rateOver 30% (IPR)?Over 20% (commercial)?
25 lb25 ÷ 1,200 × 365 ÷ 30 × 100 = 25.3%NoYes
40 lb40 ÷ 1,200 × 365 ÷ 30 × 100 = 40.6%YesYes

The 25-lb addition opens a repair on a supermarket rack and not on the process chiller. The 40-lb one opens it on both. The leak rate calculator runs either method; the annualizing vs rolling average guide explains when each fits.

Difference 2: 120 Days When the Repair Needs a Process Shutdown

§ 84.106(d)

"Owners or operators must identify and repair leaks in accordance with this paragraph within 30 days (or 120 days if an industrial process shutdown is required) of when refrigerant is added to a refrigerant-containing appliance exceeding the applicable leak rate in paragraph (c) of this section."

EPA's preamble is explicit about who that parenthetical is for: "The only narrow differentiation in the timing of leak repair in the final rule is for IPR systems in the event of an industrial process shutdown due to the complexity of adequately repairing these refrigerant-containing appliances" (89 FR 82727).

Two things to know about the 120 days:

  • It isn't automatic. It applies "if an industrial process shutdown is required" — not because the appliance is IPR. A process chiller whose leak can be fixed with the line running is on the 30-day clock like anything else. Subpart C doesn't define "industrial process shutdown." The older Section 608 rule does, for its own purposes: "when an industrial process or facility temporarily ceases to operate or manufacture whatever is being produced at that facility" (§ 82.152). Either way, write down why the repair needed one, at the time you decide.
  • It stretches more than the repair. The same "(or 120 days…)" appears on the initial verification test (§ 84.106(e)(1)), on the deadline to request an extension (§ 84.106(f)(4)), and on the window for the core repairs an extension can't defer (§ 84.106(f)(2)). It does not touch the follow-up verification test: that's still due within 10 days of the successful initial test, or of the appliance reaching normal operating conditions if it was evacuated (§ 84.106(e)(2)). The verification test post walks through both tests.

On a calendar, for an exceedance on March 10, 2026:

ClockWithout a shutdownWith a required shutdown
Repair and initial verification test (§ 84.106(d), (e)(1))April 9, 2026July 8, 2026
Outer cap on a parts-unavailable extension (§ 84.106(f)(1)(iii))September 6, 2026December 5, 2026

The repair deadline calculator gives you both dates for any exceedance date.

Difference 3: A Parts Extension Can Run to 270 Days

Any covered appliance can ask EPA for more time under § 84.106(f) — for radiological contamination, for other federal, state, local or tribal rules that make the repair impossible in time, or because the components aren't available. The parts case is the common one, and it has a ceiling:

§ 84.106(f)(1)(iii)

"Components that must be replaced are not available within 30 days (or 120 days if an industrial process shutdown is required). Additional time is permitted up to 30 days after receiving delivery of the necessary components, not to exceed 180 days (or 270 days if an industrial process shutdown is required) from the date the refrigerant-containing appliance exceeded the applicable leak rate."

Same pattern as the repair clock: the 270 days belong to a repair that requires a shutdown. The request goes to EPA electronically within the 30- or 120-day window, signed by an authorized company official, and is considered approved unless EPA tells you otherwise (§ 84.106(f), (f)(4)). The whole filing — what to include, what you still have to fix inside the original window — is in our extension post.

Difference 4: Retrofit-or-Retire Extensions Are Written for IPR

When repairs can't bring an appliance under its rate, or you choose not to repair, § 84.106(h) requires a retrofit or retirement plan within 30 days and the work finished within one year of the plan's date. Our retrofit plan post covers the plan itself.

More than a year is possible — and the only grounds the rule lists for it are written for process refrigeration. Paragraph (i) lets owners or operators request more time; its subparagraph (i)(1) is titled "Extensions available to industrial process refrigeration," and (i)(2) is reserved:

§ 84.106(i)(1), the four grounds
  • (i) Other federal, state, local or tribal regulations make a retrofit or retirement within one year impossible — more time "to the extent needed."
  • (ii) The new or retrofitted equipment is custom-built and the supplier "has quoted a delivery time of more than 30 weeks from when the order is placed." The appliance or components must then be installed within 120 days after delivery.
  • (iii) The equipment is in an area subject to radiological contamination and making it safe will take more than 30 weeks.
  • (iv) After an extension under (ii), a further request if needed — submitted "before the end of the ninth month of the initial extension."

"Custom-built" is defined too: the equipment or a component "cannot be purchased and/or installed without being uniquely designed, fabricated and/or assembled to satisfy a specific set of industrial process conditions" (§ 84.102). EPA's preamble reads (i)(1) the same way: "For IPR equipment, extension requests are allowed…" (89 FR 82735).

The deadline to ask is the one to calendar: the request goes to EPA electronically "within seven months of discovering the refrigerant-containing appliance exceeded the applicable leak rate," and is considered approved unless EPA objects within 60 days (§ 84.106(i)). If a custom-built replacement has a long lead time, get the supplier's quote in writing early — it's the evidence the (ii) request rests on.

What IPR Shares With Commercial Refrigeration

Two rules get attributed to process cooling alone. Both apply to commercial refrigeration too.

Quarterly leak inspections at 500 pounds — after an exceedance, not routinely. Under § 84.106(g)(1)(i), commercial refrigeration and IPR appliances of 500 lb or more get a leak inspection "once every three months after the date of a successful follow-up verification test," until the leak rate calculations show it hasn't leaked in excess of its rate for four quarters in a row. From 15 to under 500 lb, it's once a year until it hasn't for one year (§ 84.106(g)(1)(ii)). The part of an appliance continuously monitored by an automatic leak detection system that's audited or calibrated annually, and meets § 84.108's requirements for one, doesn't need those inspections (§ 84.106(g)(4)). Details are in our inspection-frequency post.

Automatic leak detection at 1,500 pounds — with a date coming up. Section 84.108(a) requires ALD on IPR and commercial refrigeration appliances with a full charge of 1,500 lb or more of a refrigerant containing a regulated substance, or a substitute with a GWP above 53. Appliances installed on or after January 1, 2026 need it at installation or within 30 days. Appliances installed from January 1, 2017 through 2025 need it by January 1, 2027 (§ 84.108(b)(2)). If you run a large process system from that window, that's the next date on your calendar. Our ALD post covers what a system has to do.

What's the Same for Everyone

  • Chronic leaks. An appliance of 15 lb or more that leaks 125 percent or more of its full charge in a calendar year means a report to EPA by March 1 of the next year (§ 84.106(j)) — see the chronic-leaker post.
  • Mothballing pauses the clocks. The repair and verification time frames stop while an appliance is mothballed and resume the day refrigerant is added again (§ 84.106(d)(3)); the retrofit-or-retire time frames pause the same way (§ 84.106(i)). Keep the record of both dates (§ 84.106(l)(10)).
  • Records, three years. And if a contractor does the work, they "must provide a record" of it to the owner or operator (§ 84.106(l)(4)) — the records handoff post has the list.

A Short Checklist for a Process-Cooling Owner

  1. Settle the category per appliance and write down why — especially any split-use chiller near the 50% line.
  2. Run the refrigerant test. Ammonia and CO2 systems aren't reached by § 84.106(a); HFC and HFC-blend systems of 15 lb or more are.
  3. Find your 1,500-lb systems installed 2017–2025. ALD by January 1, 2027.
  4. When a rate goes over 30%, decide at once whether the repair requires an industrial process shutdown, and record the reason. That decision sets a 30- or 120-day clock — and a 180- or 270-day outer cap if parts are late.
  5. If retrofit or retirement is coming, get supplier lead times in writing, and calendar seven months from the exceedance for any § 84.106(i) request.

Run the Right Clock on Every Process Appliance

Ref LeakLog files each appliance in its § 84.102 category, so a process unit is judged at 30%. When a rate goes over, it runs the 30-day repair clock — or the 120-day one when you declare an industrial process shutdown — shows the 180- or 270-day outer cap on a parts extension, tracks the retrofit-or-retire plan dates, and schedules the quarterly or annual inspections that follow.

Start Your Free Trial

Or see it live in the demo first — no signup needed.

Sources. 40 CFR §§ 84.102, 84.106(a)–(l) and 84.108(a)–(b), eCFR issue of 2026-10-29 (subpart C last amended 2024-12-10; re-checked against eCFR on 2026-11-19). 40 CFR § 84.64(b) table 1 (R-717 ammonia and R-744 carbon dioxide, GWP 1 each) and appendix A to part 84 (neither is a listed HFC), for the ammonia and CO2 line. 40 CFR § 82.152 (the industrial process shutdown definition) and § 82.157(a) (the 50-pound floor), eCFR issue of 2026-10-29. The ER&R final rule preamble, 89 FR 82682: the IPR shutdown sentence at 82727 and the IPR retrofit extensions at 82735. The worked leak rates and calendar dates were computed with the same engine Ref LeakLog uses.